Saturday, November 21, 2009


Progress on the guesthouse is moving along. We have recently had some heavy rain in the region and construction was slowed, but things are looking good so far. The wattle and daub is working out well, we have decided to alternate the wattle from horizontal to vertical on some panels. We wanted to see the effectiveness of the way to which we put the wattle, and see how the daub holds up. Out method is applying mud directly on the wattle, and covering that with a layer of cow manure. This acts as a binder and harder coat on top of the mud. We have also started to lay down the tiling and mosaic for the
ground floor.



We have used large stone tiles for the majority of the ground floor, and for the remaining area, we designed some simple china mosaic patterns. This building has been a learning process for Wondergrass, and will in the future house the students of bamboo.